od 14.08.2021 do 05.02.2022
Detailed design of the moat with the irrigation system and accompanying works for the Palace Complex in Kurozwęki.
![](/dl/1912/inline/scalex=1280/0e6d18/20220830_163522.jpg)
Hydroinvest sp. z o.o. made the detailed design of the moat with the irrigation system and accompanying works for the Palace Complex in Kurozwęki.